Licence | Licensee | Fieldcentre | Sect | Township | Range | Meridian | Start Date | Length |
---|---|---|---|---|---|---|---|---|
14747 | Tidewater Midstream and Infrastructure Ltd. | Red Deer | 2 | 37 | 10 | 5 | 2024-05-18 | 0.4 |
License | Permitee | Code | Sect | Township | Range | Meridian | Diameter | Approve Date | Length |
---|---|---|---|---|---|---|---|---|---|
14747 | TIDEWATER MIDSTREAM AND INFRASTRUCTU | SW | 2 | 37 | 10 | 5 | 114.3 | 2019-03-12 | 0.4 |
14747 | TIDEWATER MIDSTREAM AND INFRASTRUCTU | SW | 2 | 37 | 10 | 5 | 114.3 | 2018-11-13 | 0.4 |
14747 | TIDEWATER MIDSTREAM AND INFRASTRUCTU | SW | 2 | 37 | 10 | 5 | 114.3 | 2018-10-24 | 0.4 |
14747 | TIDEWATER MIDSTREAM AND INFRASTRUCTU | SW | 2 | 37 | 10 | 5 | 114.3 | 2018-09-25 | 0.4 |
License | Permitee | Code | Sect | Township | Range | Meridian | Diameter | Approve Date | Length |
---|---|---|---|---|---|---|---|---|---|
8238 | HUSKY OIL OPERATIONS LIMITED | FG | 2 | 37 | 10 | 5 | 88.9 | 2015-09-11 | 0 |
8376 | PLAINS MIDSTREAM CANADA ULC | HV | 2 | 37 | 10 | 5 | 114.3 | 2016-06-21 | 0 |
20256 | KEYERA ENERGY LTD. | NG | 2 | 37 | 10 | 5 | 273.1 | 2018-05-24 | 0 |
20256 | KEYERA ENERGY LTD. | NG | 2 | 37 | 10 | 5 | 273.1 | 2018-05-28 | 0 |
8239 | TIDEWATER MIDSTREAM AND INFRASTRUCTU | SW | 2 | 37 | 10 | 5 | 114.3 | 2018-10-04 | 0 |
License | Application No | Permitee | Description | Purpose | Sect | Township | Range | Meridian | Approve Date |
---|---|---|---|---|---|---|---|---|---|
6207 | 1879650 | Husky Oil Operations Limited | Gas processing plant - Sulphur recovery facility | Licence Amendment | 2 | 37 | 10 | 5 | 2017-02-22 |
6207 | 1885223 | Husky Oil Operations Limited | Gas processing plant - Sulphur recovery facility | Licence Amendment | 2 | 37 | 10 | 5 | 2017-04-21 |
Currently, this is just at the proof of concept stage, and could use more developement. However, even in it's current state, it is very useful. Data is from AER ST100 reports.
When typing in the licensee name please use the autocomplete, as the name must be exact.